Scaffolding
was a very important part of the job. We used aluminum poles and
stages to make the workplace as safe as possible.
The
aesthetics of the church were recreated down to the last detail.
We
eliminated all seams on the sides of the church by having the siding
manufacturer produce longer panels (13'6") that would span
the distance
between the pilasters at either end of the side walls. The end result
reflects the harmonious continuity that shows up with siding that
is
installed in a professional way.